SELECT DISTINCT shop_view_active_item.*
FROM shop_item_has_category
INNER JOIN shop_view_active_item ON (
shop_view_active_item.company = shop_item_has_category.company AND
shop_view_active_item.shop_code = shop_item_has_category.shop_code AND
shop_view_active_item.language_code = shop_item_has_category.language_code AND
(
shop_item_has_category.item_no = shop_view_active_item.item_no
)
)
WHERE (shop_item_has_category.category_line_no = 126250)
AND shop_view_active_item.language_code = 'ENU'
AND shop_view_active_item.company = 'DESOI'
AND shop_view_active_item.shop_code = 'B2B'
AND shop_item_has_category.company = 'DESOI'
AND shop_item_has_category.shop_code = 'B2B'
AND shop_item_has_category.language_code = 'ENU'
AND shop_item_has_category.category_shop_code = 'B2B'
Artikel zum
Warenkorb hinzufügen
Alle gewählten Artikel
zum Warenkorb hinzufügen
Artikel aus Warenkorb
entfernen
Merkliste
Merkliste
Artikel nicht auf Lager
Vorbestellung möglich
Artikel in geringer
Menge auf Lager
Artikel in ausreichender
Menge auf Lager
Artikel in Zulauf
Der Artikel ist in einer laufenden
Aktion enthalten
Injection and simultaneous pulling of ram injection lances
with separated tip
A special procedure is the simultaneous injection and pulling of ram injection lances when using the separated tip. DESOI supplies the complete equipment for manual or pneumatic machine technology. For the injection of expanding materials, a non-return valve has to be used. The system is easy to handle, can be used several times (except for the tip) and the installation is done without large equipment. Consequently, there is little impact on the soil and the immediate environment. Targeted injection by volume or pressure criterion is possible. The process is used to fill cavities in the soil, to seal e. g. dams and earth walls, and to stabilise and consolidate the soil.
INJECTION
Procedure - Injection
- Set ram injection lances with separated tip
- Placement of the pneumatic pulling device, securing of the substrate by scraper and support plate (No. 11516 + 11518)
- Place the pulling head (No. 11530 + 11535) on the ram injection lance
- Screw on bayonet plug (No. 20639-38)
- Connect material hose (No. 13683) to the DESOI PowerInject SP-20
- Start up the DESOI PowerInject SP-20 (No. 13576) with material
- Connect the material hoses (No. 13684) and connect them to the ram injection lance
- Pull the ram injection lance approx. 3 cm with a pneumatic pulling device (No. 11525)
- Start the injection device, the tip is pushed out by the material flow and the material flow begins
- Adjust the pulling speed according to the requirements
Procedure - Pulling
- When the pull-out height is reached (approx. 3 m), switch off DESOI PowerInject SP-20, close both ball valves, disconnect the material hoses
- Briefly open and close the ball valve to relieve the pressure from the material hose
- Secure the material hose with a double spring clamp
- Loosen the lance above the pulling device with two water pump pliers and turn it apart by hand
- Put down the ram injection lance (rinse if necessary), disconnect the material hose
- If necessary, inject and pull further lances or clean working material
Alternatively, the ram injection lances can be pulled with a mini-excavator or similar.