The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Artikel zum Warenkorb hinzufügen
Alle gewählten Artikel zum Warenkorb hinzufügen
Artikel aus Warenkorb entfernen
Merkliste
Merkliste
Artikel nicht auf Lager Vorbestellung möglich
Artikel in geringer Menge auf Lager
Artikel in ausreichender Menge auf Lager
Artikel in Zulauf
Der Artikel ist in einer laufenden Aktion enthalten
nach oben
Login to the online shop
Log in with your access data in the DESOI online shop. Please use your e-mail address and your password.
If you have forgotten your password, please click here.